Commercial & Industrial · Off-grid
Commercial Game Lodge
-24.2014, 27.9082Breaking ground: April 2025Completion date: June 2025
Design Concept
A ground-mount PV solution with BESS to offer this client a full off-grid solution. A generator is included.
Technical Details
- PV Plant size
- 120 kWp
- BESS (storage)
- 96 kWh
- System type
- Off-grid
- Yield (kWh/kWp)
- 1 678
Financial Details
- LTO Term
- 20 years
- IRR (Internal Rate of Return)
- 17.1%
- Capex phase 1 (single lodge)
- R 2.3 m
- Capex phase 2 (35× lodges)
- R 52 m
- LTO charge (fixed monthly)
- R 35k – R 45k / month
- LTO Escalation
- 7%
- RoI (Return on Investment)
- 523%
- Monthly savings
- R4 218
LTO = Lease-to-own. The R 35k–R 45k / month figure is a fixed monthly LTO charge, not an energy tariff.
Projects delivered by Imvelo Energy, the group’s Tier-1 EPC division.
Transparency Notice
To protect client privacy and showcase diverse engineering configurations, some imagery features conceptual 3D and AI designs alongside our physical project portfolio. We build to spec, not just to look good. For references or photos of completed local site handovers, please contact our team directly.